A disciplined framework for trustees evaluating South Florida preconstruction condominiums, from deposit exposure and jumbo financing to reserves, litigation, shared facilities, and ownership concentration.

For a family office, a South Florida residence can serve a deeply personal purpose while committing substantial trust capital. The trustee’s review should distinguish the home’s appeal from the obligations of ownership. Architecture and service belong in the selection conversation; authority, liquidity, governance, and downside exposure belong in the signing file.
Whether the search includes Brickell’s The Residences at 1428 Brickell or another address, apply the same documentary standard. Inclusion in a search is not evidence of a project’s financing eligibility or financial strength.
Begin with counsel’s review of trust authority, intended use, potential conflicts, and the proposed ownership structure. Record who may approve the investment and who may execute the agreement. These are diligence recommendations, not a statement that every trust requires identical approvals.
Before signing, have Florida counsel identify the applicable developer-sale disclosure requirements. Review the declaration, governance documents, estimated budget, and applicable offering materials together. Ask counsel to reconcile the residence being purchased with the rights, obligations, and expenses those documents establish.
Request complete plans and specifications for the offered unit and its appurtenant common-element improvements, and have counsel confirm applicable inspection rights. Use that review to distinguish contractual specifications from presentation imagery.
Treat a reservation separately from the purchase contract. Have counsel confirm the escrow arrangements and any approval or filing requirements applicable to the reservation. For each stage, identify:
The escrow custodian and required payment milestones.
Conditions for release or return of funds.
Any permitted developer use of deposited money.
Questions counsel must resolve before the next payment.
Do not assume reservation protections carry over unchanged into the purchase agreement.
For a jumbo-financed purchase, ask the intended lender to evaluate both the condominium project and the borrower. Request written guidance on required documents, outstanding eligibility questions, and when its conclusions must be refreshed before closing.
Do not assume universal jumbo-lender cutoffs for litigation, commercial space, investor concentration, or reserves. Ask the lender to state its requirements and explain how unresolved project matters affect the proposed financing.
Have counsel identify any financing-related protections in the purchase agreement. A favorable borrowing conversation is not a contractual exit right. Model a delayed loan decision, different financing terms, and a cash-closing alternative if consistent with the trust’s authority and liquidity. Record which alternatives the trustee is willing to accept.
Separate ordinary operating expenses from long-term reserve funding. Ask advisers to identify the applicable reserve requirements, the proposed funding method, and the assumptions behind annual contributions. A projected monthly assessment alone does not establish whether those assumptions are adequate.
Have counsel determine whether and when a structural integrity reserve study, or SIRS, is required for the project. Confirm the qualifications required of those performing or verifying the study, including its visual inspection.
Ask the engineering and financial advisers to examine component useful lives, replacement-cost estimates, and funding assumptions. For a preconstruction purchase, establish which documentation exists, what remains prospective, and when the applicable study obligations arise.
For a Miami Beach search including The Perigon Miami Beach, keep the same reserve questions on the agenda without presuming anything about that project’s funding.
Treat reserve planning and building-inspection obligations as separate review items. Ask counsel and the engineer to identify the milestone-inspection requirements, if applicable, and distinguish them from the project’s SIRS obligations.
Have those advisers document the project-specific timetable, including any applicable transition provisions. Do not apply a deadline discussed for an existing association automatically to a new preconstruction building.
Request available association financial statements, reserve studies, and inspection records through the appropriate channels. Have counsel confirm access and retention requirements rather than assuming unrestricted pre-purchase access.
Request information about pending claims, construction-defect notices, insurance positions, estimated defense costs, and potential assessment exposure. These requests form a diligence checklist; they do not imply that every purchaser has an automatic right to every document.
Have counsel distinguish allegations from established findings and explain what remains unresolved. Ask the lender whether an identified dispute affects its review. Do not assume all litigation has the same consequence.
Separately, have an insurance adviser examine association coverage, valuations, deductibles, and responsibility for insured property alongside the proposed unit-level policy. The objective is to understand which exposures are insured, which remain uncertain, and how much liquidity the trust would need under an adverse scenario.
Where commercial space is present, examine ownership boundaries, shared-facility rights, expense allocations, and control provisions. Ask who controls each shared facility, how maintenance and replacement costs are allocated, and which decisions residential owners can influence.
Read those provisions alongside association-turnover terms, retained developer rights, and assessment obligations for unsold units. Do not equate a projected opening budget with the trust’s settled long-term carrying cost.
A Coconut Grove comparison that includes Four Seasons Residences Coconut Grove should retain this document-first approach wherever shared arrangements apply. A residential name alone does not establish ownership boundaries or expense responsibilities.
Request ownership and rental schedules, including developer affiliates and related entities where available. Ask whether separate ownership entities represent genuinely separate interests. Distinguish completed ownership information from prospective sales information, and identify what cannot yet be established.
Do not apply an assumed universal investor-concentration percentage. Obtain the intended lender’s criteria and have counsel evaluate voting and control provisions against the available ownership information.
Close the review with a written authority-and-investment memorandum covering trust authority, conflicts, funding, deposit exposure, diligence findings, downside scenarios, and signing conditions. Assign each open issue to an adviser. Distinguish matters that must be resolved before signing from those requiring later monitoring. Any desired contractual protection should be reviewed and negotiated, not assumed.
The objective is not a file without uncertainty. It is a decision that makes uncertainty explicit before trust capital is committed, supported by project-specific legal, engineering, insurance, and lender review.
For a discreet exploration of South Florida residences, connect with MILLION.
If branded residences are on your mind — as a home or as an allocation — we would be glad to share what we are seeing, privately.
Begin a quiet conversationAsk counsel to review trust authority, intended use, conflicts, ownership structure, and signing authority. Record funding arrangements, diligence findings, and signing conditions in a written memorandum.
Review the declaration, governance documents, estimated budget, and applicable offering materials. Request complete plans and specifications for the offered unit and its appurtenant common-element improvements, with counsel confirming applicable inspection rights.
Yes. Examine each arrangement’s escrow custody, payment milestones, release and return conditions, and any permitted developer use of funds.
Do not assume universal thresholds for litigation, commercial space, investor concentration, or reserves. Obtain the intended lender’s project-specific requirements and identify outstanding approval conditions.
Have advisers examine component useful lives, replacement-cost estimates, and funding assumptions separately from operating expenses. Confirm the qualifications required of professionals performing or verifying the applicable structural integrity reserve study.
Have counsel determine whether and when a structural integrity reserve study is required for the project. Identify which documents exist and which obligations remain prospective.
Do not assume the same deadline applies. Have counsel and the engineer document the project-specific timetable and any applicable transition provisions.
Request pending claims, construction-defect notices, insurance positions, estimated defense costs, and potential assessment exposure. These are diligence requests, not automatic purchaser access rights.
Examine ownership boundaries, shared-facility rights, expense allocations, and control provisions. Review those arrangements alongside developer rights, turnover provisions, and assessment obligations for unsold units.
Request ownership and rental schedules, including developer affiliates and related entities where available. Obtain lender-specific criteria rather than applying an assumed universal concentration cutoff.


